Waterway Guide Logo
  • SUBSCRIBE
  • Explore
    • Explorer
    • Destinations
    • Marinas
      • Map
      • Directory
    • Services
      • Map
      • Directory
    • Anchorages & Free Docks
      • Map
      • Directory
    • Bridges & Locks
      • Map
      • Directory
    • Navigation Alerts
      • Map
      • Directory
    • Fuel
      • Diesel
      • Gas
      • Fuel Price List
  • Download The App
  • Destinations
  • Knowledge Center
  • Ship Store
    • Ship Store Home
    • Great Lakes Volume 1
    • Great Lakes Volume 2
    • Northern
    • Chesapeake Bay
    • Mid-Atlantic
    • Southern & Gulf Coast
    • Bahamas
    • Cuba
    • Caribbean
  • Urgent Alerts Urgent Alerts
  • Forgot Password?
    Or log in with:
    facebook
    apple
Modal title

Modal body text goes here.

Log In
Forgot Password?
Or log in with:
facebook
apple

Thanks for your valuable feedback!
Back to the Waterway Explorer

View in Waterway Explorer

Belt Line Railroad Bridge

  • Mile Marker: 2.6
  • Lat / Lon: N 36° 48.700' / W 076° 17.417'
  • Bridge Type: Lift
  • Vertical Clearance (Closed): 6.00 ft.
  • Horizontal Clearance: 300.00 ft.
  • Schedule:

    The draw will operate as follows: (1) The bridge will be left in the open position at all times and will only be lowered for the passage of trains and to perform periodic maintenance authorized in accordance with subpart A of this part. (2) The bridge will be operated by the controller at the Berkley Yard office. (3) The controller will monitor waterway traffic in the area of the bridge and directly beneath the bridge with closed circuit cameras mounted on top of the bridge and with surface navigational radar. (4) When the bridge closes for any reason, the controller will announce 30 minutes in advance, 15 minutes in advance, and immediately proceeding the actual lowering, over marine channel 13, that the Belt Line Railroad Bridge is closing for river traffic. In each of these three announcements, the bridge/train controller will request all concerned river traffic to please acknowledge on marine channel 13. (5) The bridge shall only be operated from the remote site if closed circuit visual and radar information shows there are no vessels in the area and no opposing radio communications have been received. (6) While the Belt Line Bridge is moving from the full open position to the full closed position, the bridge/train controller will maintain constant surveillance of the navigational channel to ensure no conflict with maritime traffic exists. In the event of failure of a camera or the radar system, or loss of marine-radio communications, the bridge shall not be operated by the off-site bridge/train controller from the remote location. (7) If the off-site bridge/train controller's visibility of the navigational channel is less than 3/4 of a mile, the bridge shall not be operated from the remote location. (8) When the draw cannot be operated from the remote site, a bridgetender must be called to operate the bridge in the traditional on-site manner. (9) The Belt Line mid-channel lights will change from green to red anytime the bridge is not in the full open position. (10) During the downward and upward span movement, a warning alarm will sound until the bridge is seated and locked down or in the full open position. (11) When the bridge has returned to its full up position, the mid-channel light will turn from red to green, and the controller will announce over marine radio channel 13, "Security, security, security, the Belt Line bridge is open for river traffic." Operational information will be provided 24 hours a day on marine channel 13 and via telephone 757-271-1741 or 757-633-2241.
    Editor's Note: Bridge schedules are subject to temporary change due to repairs, maintenance, events, etc. Check the Waterway Explorer for possible nav alerts.

  • VHF Channel: 13
  • Phone: 757-271-1741

DISCLAIMER: Bridge heights and clearances are published from sources and records provided by various state and federal entities. Waterway Guide Media does not warrant the information as accurate. Water depth, placement of on-location signage and other variables may impact published horizontal and vertical clearances. Exercise caution when transiting.


1 Boater Comment

These are observations from the boating community. Waterway Guide information is verified regularly and all efforts will be made to validate any new updates submitted here. Thank you for taking the time to share comments about your experience.

Waterway Guide reserves the option of editing reviews and comments for grammar, clarity and the removal of defamatory or potentially slanderous language. When appropriate, reviews are forwarded to businesses for response prior to being made public. We will make every effort to be objective and impartial when posting reviews, but do not publicize details of disputes between parties.

Current Review Policies

Waterway Guide reserves the option of editing reviews and comments for grammar, clarity and the removal of defamatory or potentially slanderous language. When appropriate, reviews are forwarded to businesses for response prior to being made public. We will make every effort to be objective and impartial when posting reviews, but do not publicize details of disputes between parties.

  • Comments are reviewed and/or verified by Waterway Guide staff and do not post immediately. Please use a valid email address so that we can contact you if we need clarification (email address will not be published).
  • Name will be published. Anonymous comments may not be posted.
  • Comments will be shared with the reviewed marina to offer them an opportunity to respond. If they choose to do so, the marina’s comments may also be posted in response to the original comment.
  • Comments containing foul or obscene language will be rejected or returned for resubmission.
  • Comments containing personal attacks will be rejected or returned for resubmission.
  • Off-topic content will be rejected.
  • Comments must describe commenter's personal experience – “hearsay” reports will be rejected.
  • Comments must be understandable and clear enough to inform other boaters.
  • URL links are allowed only if they inform the content – no “advertising” your business or blog.

  • Comment by: Christopher Carmody on Oct 30, 2022
    Vessel Type: Power
    LOA: 43'
    Draft: 4.0'

    Beginning/ending of the no wake zone heading north/south through Norfolk. Always a Navy patrol boat on north/west side.

    View location on the Waterway Guide Explorer

Comment on this Bridge

The name field is required.

The email field is required.

  Display?

LOA is required.

Draft is required.


Yes, sign me up for the News & Navigation Alerts.

Sending...

Review Policies
  • Explorer
  • Download The App
  • Destinations
  • Knowledge Center
  • Shop
Popular Resources
Fuel Price Reports
View the Directory
Subscribe To Our Newsletter
logo
About Us
Contact
Advertise
Careers
Legal
Marina Login
© 2025 Waterway Guide Media LLC: All rights reserved. No part of this site may be reproduced without written permission.
Waterway Guide is proud to be a sponsor of:
aglca
mtoa
seven-seas
us-sailing
abm
Apple Sign-In
Note: If you already have a Waterway Guide account please choose, when prompted, to share your email with us so we can sign you in to your proper account.
Newsletter Sign-Up

A is used to propel a boat using the wind.

The captcha question was answered incorrectly.

The email is invalid. Please close the modal window and try again.

Signing-up...